The Primavera P6 Schedule Quality Checklist (Before You Submit)
Before a schedule reaches the owner, it should pass a quick quality review. A clean schedule gets accepted faster, keeps the team's trust, and holds up if a delay claim ever comes. Here is a practical checklist you can run on any Primavera P6 schedule — grouped the way problems actually show up.
0 / 20
Tick each item as you check it.
Logic
Logic 5 checks
Constraints
Constraints 3 checks
Float & durations
Float & durations 3 checks
Dates & status
Dates & status 3 checks
Structure & baseline
Structure & baseline 4 checks
Metrics to confirm
Metrics to confirm 2 checks
The checks are not independent. Hard constraints suppress negative float, and missing logic inflates it — so a schedule can look calm on float while the logic underneath is broken. Run the whole list, not the parts that are easy to check.
Run the whole checklist automatically
Running this by hand every update is slow. Grupo AE — Schedule Intelligence reads your Primavera P6 (.xer) file and returns a 0–100 quality score, the full DCMA 14-point result, float and constraint analysis, and CPLI/BEI/SPI — in seconds, with snapshot history over time.
Schedule Intelligence
Check the whole schedule in seconds
Upload your .xer and get the quality score, the DCMA 14-point result, float and constraint analysis, and CPLI/BEI/SPI — with a snapshot history so you can watch them move update over update.
Schedule Intelligence is a professional support tool; its outputs are drafts for review. When a contract specifies a scheduling platform, that platform's dates govern for contractual purposes.